Bifold Group
Location: Chadderton, Manchester
Client: Bifold Group
Duration: 12 Weeks
Cost: £125,000
Sector: Industrial
Description:
Bifold is the leading UK manufacturer of instruments, valves and pumps for the oil and gas sector operating in field where quality control and technical excellence is paramount.
As part of their expansion process they moved to new office accommodation and production facilities.
Celsius were engaged as part of the fit out process to provide Mitsubishi VRV air conditioning systems and Mitsubishi Lossnay heat exchange ventilation systems to the office areas and extract and fresh air input systems to the production areas.
Air conditioning systems are controlled via both local remote controllers and a centralised touch screen controller giving complete flexibility and control of operation.